Mr. Li Teng visited the Xinji Project for Work Inspection and Guidance
On Sep 12th 2013, Mr. Li Teng, The DM of WOM has visited Xin Ji Project for inspection.
With the company of safety production manager Wang Anxiang, Li Teng visited the site with the helmet, he checked the PA and SA fans, #3 feed water pump, turbine, generator and boiler coal chute, and then familiarized with the operation state of maintenanced equipment, he reminded the local staffs to pay attention to the carefulness during the work, in order to avoid the re-maintenance. Then he checked the implementation of each working systems.
During the summarizing meeting, Mr. Li Teng expected all the local staffs would finish every single work perfectly, try the best to ensure the safety of equipment and staffs. He also said that the manager and administrator need to familiarize with site work, and needs to keep well connection with site workers, he hopes all the project staffs will unite together to ensure the stabilization of unit operation and finally achieve a better future.

相关附件:
