News

Project Status

Home > News > Project Status

WOM Linhuan project company carries out flood control emergency drill

04/23/2021

        Recently, continuous rainfall in Huaibei area, Linhuan project company, according to the actual situation of frequent rainfall in recent years, caused the water inflow of cable trench in the switch room to affect the safe and stable operation of electrical equipment switch room as the drill scene. Organize all the electrical team 1 personnel to carry out flood control emergency actual combat and flood prevention emergency drill in phase I chemical 400V switch room.

        During the whole drill process, through professional and orderly arrangement, close cooperation of participants, reliable operation of flood control equipment, only tens of minutes, the water level was effectively controlled, at the same time, a comprehensive inspection of cable trench plugging was carried out to ensure that the water level was controllable. The environment of the drill is realistic, the scene is real, and the drill atmosphere is tense. At the same time, the drill is replaced by war, which effectively improves the emergency response ability of professionals, further enhances the safety awareness and emergency input initiative of professionals, and lays a solid foundation for flood control work in the coming flood season.(Liu Yuanli)

 


Company Addrss: 17th floor, Chuangxin Building, 150 Haitang Road, High-tech zone, Hefei Telephone: +86 551 6258 7766
Copy rights©2010