The boiler specialty of WOM project department continuously promotes equipment standardization
09/01/2020
Recently, the high temperature weather continued, and two units of the first phase of Anqing project department have been put into operation. Under the premise of ensuring the safe and stable operation of the operating units, the boiler specialty of Anqing phase I project department arranged personnel to carry out valve stem grease filling work in the heat of high temperature, so as to ensure that each valve can operate reliably, stably and flexibly; at the same time, painting anti-corrosion and marking work for hand-operated valve handwheel in all jurisdiction areas, continuously promoting the standardization of equipment management conduct.(LiuYuanli)