During the period of epidemic prevention and control in Cuba, the power grid fluctuated greatly and the power supply became tight. Therefore, the power grid of Cuba requires the ciroredondo power plant to complete the work of shutdown and defect elimination in advance, and to connect the power grid as soon as possible to solve the power supply problem. At the same time, the Ministry of sugar industry of Cuba also hopes that the Siro Redondo power plant can start to supply steam to them as soon as possible to ensure production.
After careful planning, the WOM Cuba project department has formulated the epidemic prevention and control plan and the management measures for Cuban power plant employees. In the face of insufficient personnel and imperfect site facilities, the project department has the courage to take responsibility and overcome various difficulties. At 12:51 on April 14, the company successfully connected to the grid for power generation, and made contributions to the prevention and control of epidemic situation and stable production in Cuba, which was highly praised by the owner。(Li Yuanli)
Company Addrss: 17th floor, Chuangxin Building, 150 Haitang Road, High-tech zone, Hefei
Telephone: +86 551 6258 7766
Copy rights©2010