On the hot June day, Pingshan Power Plant is in high load operation state, the quantity of medicine in each region increases and the frequency of drug supply increases too. In order to ensure the safe use and sufficient storage of drugs, Pingshan Project Department strictly implements the dangerous chemicals management system and strengthens the operation and management of drug storage area.
The project department stipulated that according to the drug use situation in each region, the required drugs should be reported to the owner in advance to prevent the insufficient storage of drugs from affecting the operation of the equipment; strictly enforce the management system of large quantities of drugs, do a good job in the registration of drugs in and out of the storehouse; and strengthen the routing inspection for the acid area, during the use of acid and alkali drugs, the leakage prevention measures should be done, and the registration work should be done in time. Strengthen the inspection of safe medicine box and spray device in acid-base area to ensure that they are in standby at any time.
Company Addrss: 17th floor, Chuangxin Building, 150 Haitang Road, High-tech zone, Hefei
Telephone: +86 551 6258 7766
Copy rights©2010