News

Project Status

Home > News > Project Status

Anqing Phase II Project Department actively prepares for Flood Control and Drought Relief

05/22/2018

        In order to do a good job of flood control and drought resistance in 2018, the Anqing Phrase II Project Department, on the basis of the related documents of Wenergy group company and Shenwan company as well as the aimed at the actual production of #4 units, actively cooperated with Party A to check the situation of flood prevention and drought preparedness, comprehensively investigated the emergency supplies and the hidden dangers in the production site, made sure the hidden dangers are effectively eliminated before the flood season.

        Project Manager Mr. He Xiaoxin strictly requests the project department staff to strengthen the key parts and the weak parts inspection during the time of flood prevention and drought resistance, carry out the protection measures for the outdoor equipment, the factory buildings and so on. He also carries out the flood prevention and drought preparedness from the aspects of management, personnel, materials and emergency plans, and defines responsibilities and tasks. Make arrangements for safe production in flood season ahead of schedule, strengthen the risk awareness and crisis awareness of project staff, and implement various measures for flood prevention and drought relief in place.

 


Company Addrss: 17th floor, Chuangxin Building, 150 Haitang Road, High-tech zone, Hefei Telephone: +86 551 6258 7766
Copy rights©2010