WOM Taicang Guarantee Power Supply for G20 Summit
10/25/2016
The Summit joined by a group from 20 countries in 2016, which is short for G20 Summit, was convened on Sep 4th and Sep 5th. In order to guarantee the safe and stable operation of power supply during this special period, WOM Taicang project department spared all efforts to prepare for safe and stable production on the political basis. The team to ensure power supply was set up. From August 26th to September 6th, the team took deliberate arrangement and measures on every detail. The coal conveying system, FGD and circulating pump system were essential to be supervised. It requested that all staff tend to their positions and responsibilities. The coal conveying operation shift was given more prominence on control of firefighting. As for high volatile coal and inflammable coal, it was required for flushing and severe supervision to prevent coal self-ignition. When adding coal to bunker, it took more attention to prevent abnormal situations such as coal plugging, combustion, boiler shutdown, unit load limit or discharge beyond standard.
Through all these measures taken by WOM Taicang department, the power supply for G 20 Summit was somehow guaranteed. The future goal of stable power supply was also provided by a solid foundation.