The maintenance team of WOM Company successfully completed the important node of the drawing rotor from the generator in Linhuan Zhongli Power Generation Co., Ltd.

04/10/2019

        On April 6th, 2019, at 12.6 meters overhaul site of Linhuan Zhongli Power Generation Co., Ltd., electrical, turbine and field command personnel were on standby. In order to complete the major node of generator rotor extraction, all work was ready. At 9:00 a.m., with a crisp whistle from the field commander-in-chief, the work of drawing the rotor began.

        During the whole process of rotor drawing, all the engineers and technicians involved in the process of rotor drawing were under the unified command of the general commander on the spot with reasonable division of labor, coordinated and unified work. Due to the adequate preparatory work, the generator rotor was pulled out slowly from the stator chamber intact at 11:22, and landed smoothly on the designated special base. So far, the work of drawing rotor of No. 2 generator has been completed smoothly and one day ahead of schedule.

        As an important node of this overhaul work, the leaders of WOM Company attach great importance to the generator rotor drawing. Deputy Manager, Mr. Zhang Xuechuo abandoned his vacation break and went to the job site. Before the operation, he organized the technical personnel drawn from various specialties to compile and optimize the scheme of generator rotor extraction according to the site situation and past experience, and gave important guidance. In view of the generator rotor extraction, the project department has formulated detailed safety measures, organizational measures and technical measures, rationally matched with the field professionals and experienced personnel, formed working groups, and clearly defined the division of responsibilities, key directions, and safety control of important links. Throughout the whole process of rotor extraction, all the inspectors conscientiously implement the technical plan and prepare special tools, and carry out all work in strict accordance with the procedures in an orderly manner. The whole process of the rotor drawing has been well planned and the lifting command is advantageous, which ensures the one-time success of the rotor drawing work, and provides a strong guarantee for the efficient promotion of the overhaul work of Linhuan Zhongli Power Generation Co., Ltd.

 


Company Addrss: 17th floor, Chuangxin Building, 150 Haitang Road, High-tech zone, Hefei Telephone: +86 551 6258 7766
Copy rights©2010